Click on Picture to Enlarge for details

Knit by Marianne in Denmark using Peaches & Creme™ Painted Desert using size 7 (US) needle

Lace & Cable Ensemble
by Maile Mauch

Supplies:
1 Skein Peaches & Creme™ Knitting Worsted
1 Pair size 7 (US) single point needles
1 Pair size 7 (US) double point needles
Tapestry needle
Scissors

Cast on:

Back Scrubber: 22 stitches with B2
Small Cloth: 26 stitches
Medium Cloth: 37 stitches
Large cloth: 48 stitches

Knit 1" of border, then begin pattern.

Pattern
x 11+7

Row 1 (WS) and all wrong side rows: B4,purl across, B4.
Row 2: B4,k1,*yo,ssk,k1,k2tog,yo,k6* to last 10 sts,yo,ssk,k1,k2tog,yo,k1,B4.
Row 4: B4, k2,*yo,sk1-kk2tog-psso,yo,k1,sl3 to dpn, hold to back, k3, then k3 from dpn,
k1* end last 9 sts yo,sl1-k2tog-psso,yo,k2,B4.
Row 6: Repeat Row 2.
Row 8: B4,k2,*yo,sl1-k2tog-psso,yo,k8* end last 9 sts, yo,sl1-k2tog-psso,yo,k2,B4.


These 8 rows make up the pattern. Knit till 1 border distance away from
desired length. Knit Border, bind off and weave in ends.

For Back scrubber:
CO: 22 stitches

Knit 1" of border and start pattern.

The Border is B2, instead of B4. If wider scrubber is desired Cast on:26 with a B4.


Knit till 16-19" then knit border. Bind off all but 3 stitches, knit I
cord for 9" bind off and sew for handle. Knit a second I-cord for 9" for
cast on edge handle.

Copyright © 2007 K1, P1, Keeping You In Stitches Studio. All Rights Reserved